

This bridge was under water some days later...



the dam in 2004... and now!




Water is released from the dam - at that time it was at about 120% - now it is at 200% (100% drinkwater - 100% floodwater) Water had to be released even when Brisbane was getting flooded, otherwise the dam might have collapsed.


No comments:
Post a Comment